Offices, Operational and Maintenance Buildings, - Equipped Electromechanical Workshop
Cost of the works: 302 million FCFA; Land area: 7250 m²; Developed floor area: 1920 m².

Missions:
Technical studies (Low Voltage & High Voltage Electricity, HVAC, Plumbing, sanitation and roadworks), sketch phase, preliminary design, and detailed design.

Project

Client EGIS
Country Cameroon
Donor BAD
Overall cost of works three hundred two million ( FCFA)

EXPERTISE

Sector INFRASTRUCTURES--Fixtures and fittings and external works