INFRASTRUCTURES Buildings

PROJECT TITLE

Technical feasibility studies (APS&APD) for the structuring and socio-community infrastructures of the PACAD project in the Central African Republic (Lot2)

More

Characteristics

Collector 183 ml; 5 Schools, One health center; Prefabricated bridge with metal decking: 43 m; 40 streetlights with photovoltaic panels; Cost of the works: 2,000,000 USD;

Missions:

Feasibility and Preliminary Studies (EIES, Topography, Geotechnics) Sketch studies; Preliminary Studies (AVP); CAD.

Project

Client UNOPS
Country RCA
Donor BM
Overall cost of works two million ( USD)

EXPERTISE

Sector INFRASTRUCTURES--Buildings
Project duration 6 Month