PROJECT TITLE

Control and Monitoring of the works for the Rehabilitation and Upgrading Project of the building housing the services of the Secretary General of the Prime Minister (SGPM).

More

Characteristics
Type of building R+3+2SS; Cost of works: 1,820,995,237 FCFA; Land area: 4000 m²; Developed floor area: 7914 m².


Missions:
Missions VISA DET, OPC, and AOR Technological lots (high voltage electricity, low voltage electricity, sanitary plumbing and fire protection, air conditioning, ventilation, smoke extraction).

Project

Client Egis
Country Cameroon
Donor BIP Exercice 2016
Overall cost of works one billion eight hundred twenty million nine hundred ninety-five thousand two hundred thirty-seven ( FCFA)

EXPERTISE

Sector
Project duration 36 Month