PROJECT TITLE
Control and Monitoring of the works for the Rehabilitation and Upgrading Project of the building housing the services of the Secretary General of the Prime Minister (SGPM).
More
Characteristics
Type of building R+3+2SS; Cost of works: 1,820,995,237 FCFA; Land area: 4000 m²; Developed floor area: 7914 m².
Missions:
Missions VISA DET, OPC, and AOR Technological lots (high voltage electricity, low voltage electricity, sanitary plumbing and fire protection, air conditioning, ventilation, smoke extraction).