PROJECT TITLE
Geotechnical and topographical work control and monitoring within the project's framework for the bridge-building and road construction between Batchenga and Ntui
More
Characteristics
Construction of a 210-meter-long bridge, Construction of 3 kilometers of urban roadways
Missions:
Contribution to the mission DET