PROJECT TITLE
Hydrogeological, geotechnical, chemical and technical studies (APS, APD, PRO and DCE) for the construction of over 30 km of water supply network,
More
Hydrogeological, geotechnical, chemical and technical studies (APS,
APD, PRO and DCE) for the construction of over 30 km of water supply network,
Construction of 76 isolated boreholes, 10 boreholes integrated into the SAEP
as catchment points, elevated metal or reinforced concrete reservoirs
(between 25 and 163M3), water treatment units and treatment stations in 3
Regions of Cameroon for the towns of Koutaba, Massock, Ebebda,
Matomb.
Features
Construction of 76 isolated boreholes, rehabilitation of more than 20 boreholes;
Construction of water supply networks (a total of over 30km) with underground and surface
construction of more than 12 reservoirs (between
25,163M3); Cost of works: 6million Euros
Missions :
Carrying out a technical assessment of the current situation, Technical
of existing water production, supply and distribution infrastructures
and distribution infrastructures, elaboration of an investment program and project
Project development (APD, PRO, DAO)