PROJECT TITLE
Technical feasibility studies (APS&APD) for the structuring and socio-community infrastructures of the PACAD project in the Central African Republic (Lot2)
More
Characteristics
Collector 183 ml; 5 Schools, One health center; Prefabricated bridge with metal decking: 43 m; 40 streetlights with photovoltaic panels; Cost of the works: 2,000,000 USD;
Missions:
Feasibility and Preliminary Studies (EIES, Topography, Geotechnics) Sketch studies; Preliminary Studies (AVP); CAD.