PROJECT TITLE
Hydro-geological, geotechnical, chemical and technical studies (APS, APD, PRO and DCE) for the construction of over 30 km of water supply network,
More
Characteristics
Construction of 76 Isolated Wells, Rehabilitation of more than 20 Wells; Construction of AEP networks (a total of more than 30km) with underground and surface capture, Construction of more than 12 reservoirs (between 25,163M3); Cost of the works: 6 million Euros
Missions:
Conducting a technical assessment of the current state, Technical Diagnostics of existing Water Production, Supply, and Distribution Infrastructures, Development of an Investment Program and Project Development (APD, PRO, DAO)