CONSTRUCTION MANAGEMENT Drinking water supply

PROJECT TITLE

Hydro-geological, geotechnical, chemical and technical studies (APS, APD, PRO and DCE) for the construction of over 30 km of water supply network,

More

Characteristics
Construction of 76 Isolated Wells, Rehabilitation of more than 20 Wells; Construction of AEP networks (a total of more than 30km) with underground and surface capture, Construction of more than 12 reservoirs (between 25,163M3); Cost of the works: 6 million Euros

Missions:
Conducting a technical assessment of the current state, Technical Diagnostics of existing Water Production, Supply, and Distribution Infrastructures, Development of an Investment Program and Project Development (APD, PRO, DAO)

Project

Client UNOPS
Country Cameroon
Donor KOICA
Overall cost of works six million ( EUR)

EXPERTISE

Sector GESTION DES CONSTRUCTIONS--Drinking water supply
Project duration 9 Month