Mission Architectural and technical studies as well as works supervision for the Constr...
CharacteristicsBuilding type R+1; Cost of works: 1,777,519 Euros; Land area: 4000 m&sup...
CharacteristicsBuilding type R+1; Cost of works: 1,777,519 Euros; Land area: 4000 m&sup...
CharacteristicsSingle-story building; Cost of work: 1,616,740 Euros; Land area: 3,500 m...
CharacteristicsConstruction of 5 schools (CES of CAP ESTERIAS built on 2 ha, Alibandeng...